Valladolid Carrocerias Plant
The Body Plant is an autonomous plant as of July 1, 2021. Inaugurated in 1964, the Body Plant was merged with the Assembly Plant for 26 years, becoming part of the Valladolid Body and Assembly Plant in 1995. The scope of the plant is the production of batteries, bumpers, stamped/welded parts and plastic injected parts.
- FOUNDED IN: 1964
- LEGAL FORM AND CAPITAL OWNERSHIP: Société Anonyme (limited company) fully owned by Renault España SA
- ACTIVITY: Production of plastic and metal parts, batteries
- WORKFORCE: 973 at December 31, 2023
- AREA: 30 ha, o/w 17 ha of covered buildings
- CERTIFICATIONS: ISO 14001 and ISO 9001
Main products
Products: batteries, bumpers, stamped and injected parts
- Batteries: 131,796 units
- Bumpers: 604,324 units

Environment
Throughout the entire manufacturing process, the plant’s commitment to the environment prioritizes on the prevention and the constant reduction of its environmental footprint.

Quality
Quality is a priority for the plant. Our objective is to establish the plant as an industrial reference in terms of quality within Renault Group.

News
Valladolid Carrocerias Plant Manufactures its 300,000th Battery
On March 22nd, 2024, the Valladolid Carrocerias plant manufactured its 300,000th battery since production began in June 2019. Today, the plant’s facilities feature an innovative battery line that produces both the BTA 1.0 battery for the Captur E-TECH Hybrid manufactured in Valladolid and the BTA 1.5 battery for hybrid vehicles manufactured in Palencia.

Our history
Back to the key dates
- 1962: creation of the assembly plant, under the name FACSA (Fabrication Carrosseries SA).
- 1995: bodywork and assembly activities are grouped together into the Assembly plant of Valladolid.
- 2017: new Plastic Injection workshop (for Captur tailgate).
- 2019: new painting line for plastic parts, assembly of shields and a new battery workshop to manufacture 100% of the hybrid batteries for vehicles in Valladolid and Palencia.
- 2021: Separation of the Valladolid Bodywork and Assembly plant into two independent units in July 2021.
- 2023: On 20 June, the battery workshop manufactures its 100,000th battery since the launch of production in June 2019.
Contact us
Factoria de Renault
Ctra. Arcas Reales Km 3, 47008 Valladolid, Spain
+ 34 983 41 60 00